PROJECT: LOS ANGELES UNIFIED SCHOOL DISTRICT
FEMA HAZARD MITIGATION FOR CEILINGS, LIGHT FIXTURES AND ASBESTOS AND LEAD ABATEMENT
LOS ANGELES, CA
The scope of work included detailed building surveys, design, preparation, distribution and evaluation of all bid materials, contract administration, construction management, coordination with structural engineers and outside asbestos, lead and safety consultants, for 1,600 large and small structural hazard mitigation projects in over 900 sites throughout the District. Warner also supplied expert asbestos survey, evaluation, and coordination with the District's Asbestos Technical Unit, and managed asbestos and lead abatement projects, fire alarm and access compliance projects. Warner coordinated with outside structural engineers and DSA, when required.

Warner's project management services included preparing contractor supplemental prequalification bids, modification of contract language designed to reduce the cost of change orders and eliminate claims, detailed reports covering the entire unit's scope of work and schedule and funding analysis.
_____

PROJECT: LOS ANGELES UNIFIED SCHOOL DISTRICT
THE NEW LIBRARY AT KENTER CANYON CHARTER ELEMENTARY SCHOOL
LOS ANGELES, CA
The construction of this new craftsman-style 1,700 square foot library included reclamation of architectural-quality building materials from a completed movie set, complete project management and construction management services from project inception to completion, assisting in fundraising activities, coordination with LAUSD, parent groups, local officials, CEQA consultants, architects and engineers, and obtaining DSA approvals. Warner also provided various access compliance and other school site upgrades and supplied construction financing for the project. The level of quality and attention to detail in this project demonstrate that it is possible to build aesthetically pleasing learning spaces, safely and cost effectively, in public schools.
_____

PROJECT: LOS ANGELES UNIFIED SCHOOL DISTRICT
SEVEN HIGH SCHOOLS AND ELEMENTARY SCHOOLS
LOS ANGELES, CA
The scope of work included detailed building surveys, installation of rooftop multi-zone units provided by the District at 95th Street Elementary and Banneker Special Education Center, design and installation of 21 package AC units at Banneker Special Education Center, specification and installation of timers and controls for units, boiler replacement at Manual Arts High School, duct cleaning, condensing unit refurbishment and retrofit of supply and return fans, lighting system design and installation at all schools, football field lighting design and installation at Cleveland High School, water saving measures, and preventive maintenance activities. Warner also performed measurement and verification of savings all as part of its comprehensive performance contract.

Project Information:
Utility Company: Department of Water & Power & Southern California Edison

Total Square Feet: Approximately 970,416 SF
_____

PROJECT: LOS ANGELES UNIFIED SCHOOL DISTRICT
MOUNT VERNON MIDDLE SCHOOL
LOS ANGELES, CA
The scope of work included detailed building surveys, demolition of 2 chillers, installation of 1 new 250 ton chiller, new primary and secondary CHW pumping scheme, new 2-cell cooling tower, installation of refrigerant sensor, monitor, alarm system and evacuation fan ventilation system for refrigerant management, new control air compressor station, installation of 4 package units and associated duct work, installation of a kitchen make-up air/heating unit, lighting system design and installation, and preventive maintenance activities. Warner also designed and produced a customized energy education program for District students and teachers and performed measurement and verification of savings all as part of its comprehensive performance contract.

Project Information:
Utility Company: Department of Water & Power

Total Square Feet: Approximately 157,540 SF
_____

PROJECT: LOS ANGELES UNIFIED SCHOOL DISTRICT
SIXTEEN ELEMENTARY & MIDDLE SCHOOLS
LOS ANGELES, CA
The scope of work included detailed building surveys, installation of rooftop multi-zone units at two sites, design and installation of package AC units, specification and installation of timers and controls for unit ventilators and heat pumps, boiler decommissioning, lighting system design and installation, water saving measures, and preventive maintenance activities. Warner also designed and produced a customized energy education program for District students and teachers, performed measurement and verification of savings, and arranged third-party tax-exempt financing, all as part of its comprehensive performance contract.

Project Information:
Utility Company: Department of Water & Power

Total Square Feet: Approximately 785,000 SF
_____

PROJECT: LOS ANGELES UNIFIED SCHOOL DISTRICT
NINE ELEMENTARY & MIDDLE SCHOOLS, LOS ANGELES, CA
The scope of work included detailed building surveys, installation of rooftop multi-zone units at two sites, design and installation of package AC units, specification and installation of timers and controls for unit ventilators and heat pumps, boiler decommissioning and relocation, lighting system design and installation, water saving measures and preventive maintenance activities. Warner also designed and produced a customized energy education program for District students and teachers, performed measurement and verification of savings, and arranged third-party tax-exempt financing, all as part of its comprehensive performance contract.

Project Information:
Utility Company: Department of Water & Power

Total Square Feet: Approximately 310,000 SF
_____

PROJECT: LOS ANGELES UNIFIED SCHOOL DISTRICT
FEMA HAZARD MITIGATION LIGHTING SURVEYS, LOS ANGELES, CA
Warner has performed detailed surveys of LAUSD schools and prepared bid packages for LAUSD to bid out the FEMA-funded portion of lighting retrofits. Warner's scope of work includes providing customized survey documents and LAUSD bid packages, and also providing construction management services for LAUSD.

WTI also, under a separate contract, performed the hazard mitigation work in over 180 sites.

Project Information:
Utility Company: Department of Water & Power and Southern California Edison

Total Square Feet: Over 20.0 million SF
_____

PROJECT: US NAVY/MARINE CORPS AIR-GROUND COMBAT CENTER, TWENTY-NINE PALMS, CA
Warner provided total turnkey services, including energy audits, project management, installation, hazardous waste disposal and post-installation verification, for the installation of energy saving lighting equipment throughout over 396 buildings on the Navy base. Warner supplied the required documentation for the utility-sponsored incentive program.

Project Information:
Utility Company: Southern California Edison Co.

Total Square Feet: Approximately 4.1 million SF
_____

PROJECT: US NAVAL AIR WEAPONS STATION - MICHELSON LABS, CHINA LAKE, CA
In 1997-98, Warner provided total turnkey services, including energy audits, project management, installation, hazardous waste disposal and post-installation verification, for the installation of energy saving lighting equipment throughout 40 buildings on this Navy base. Warner supplied the required documentation for the utility-sponsored incentive program.

Project Information:
Utility Company: Southern California Edison Co.

Total Square Feet: Approximately 2.0 million SF
_____

PROJECT: US NAVY HOSPITAL, CAMP PENDLETON, CA
In 1995, Warner provided total turnkey services including energy audits, project management, installation, hazardous waste disposal and post-installation verification for the installation of energy saving lighting equipment in the hospital's facilities. Warner handled all required documentation for the utility-sponsored rebate program.

Project Information:
Utility Company: San Diego Gas & Electric

Total Square Feet: Approximately 400,000 SF
_____

PROJECT: U.S. NAVY FLEET INDUSTRIAL SUPPLY CENTER (FISC), BROADWAY & POINT LOMA
In 1996, Warner provided total turnkey services including energy audits, project management, installation, hazardous waste disposal and post-installation verification, for the installation of energy saving lighting equipment in base facilities. Warner handled all required documentation for the utility-sponsored rebate program.

Project Information:
Utility Company: San Diego Gas & Electric

Total Square Feet: Approximately 350,000 SF
_____

PROJECT: CEDARS-SINAI MEDICAL CENTER, LOS ANGELES, CA
In 1996 and 1997, and with the final phase in 2000, Warner provided total turnkey services, including lighting system audit, project management, installation, hazardous waste disposal and post-installation verification, for the installation of energy saving lighting equipment at the hospital's facilities.

Project Information:
Utility Company: Los Angeles Department of Water & Power

Total Square Feet: Approximately 3.0 million SF
_____

PROJECT: CITY OF NEWTON, NEWTON, MA
From 1990 to 1991 Warner provided total turnkey services including energy audits, project management, installation, hazardous waste disposal and post-installation verification, for the installation of energy saving lighting equipment in 44 city owned facilities. Warner coordinated a utility sponsored program that funded 100% of the project's cost.

Project Information:
Utility Company: Boston Edison Company

Total Square Feet: 2.0 million SF
_____

PROJECT: BOSTON PUBLIC SCHOOLS, BOSTON, MA
This Large C&I turn-key project, completed in 1996, included a complete survey, redesign and replacement of the existing lighting systems, coordination with the utility, project management, savings verification metering and monitoring, and hazardous waste disposal.

Project Information:
Utility Company: Boston Edison Co.

Total Square Feet: 1.83 million SF
_____

PROJECT: CITY OF WALTHAM, WALTHAM, MA
Warner provided turn-key services including energy audits, project management, installation, hazardous waste disposal and post-installation verification, for the installation of energy saving lighting equipment at schools and city facilities. The lighting systems included the conversion of surface mounted fixtures to recessed troffers, redesign of gym lighting, and exit sign lighting. Warner coordinated a utility-sponsored program which, for many sites, funded 100% of the cost.

Project Information:
Utility Company: Boston Edison Company

Total Square Feet: 2.0 million SF

WHO WE ARE | PROJECT MANAGEMENT | PUBLIC WORKS CONSULTING | MISSION STATEMENT | WHY WARNER?
PROJECT EXPERIENCE | PUBLIC | PRIVATE | COMMUNITY | PROJECT CASE HISTORIES | TESTIMONIALS | CONTACT US | HOME

Warner Technologies, Inc.
Mailing Address:
11693 San Vicente Blvd, #717
Los Angeles, CA 90049
1-310-444-0488

Copyright © 2004-2012 by WARNER TECHNOLOGIES, INC.; All Rights Reserved.
Website by: Rainbow Splash